How can we schedule a load job to insert data from Google Sheet into Teradata Table?

General
Teradata Employee

How can we schedule a load job to insert data from Google Sheet into Teradata Table?

Hi All,

 

One of the business user at my client side has come up with a requirement where he is required to load data from Google Sheet into Teradata Table. The data in the Google Sheet is also constantly changing, which means that the user has to schedule the load job at a periodic interval no more than 60 mins.

 

Could you please share your thoughts on how to go about this?

 

Regards,

Abhinav Mishra